Deleum’s entire building structure, which consists of two blocks were fully fitted out and decorated by Shinrai to cater to their needs. Such was their satisfaction with our quality of work that 10 years later, we were called in again to give the place another facelift. Aside from giving Deleum a makeover, a Link Bridge was also constructed to connect their two existing blocks, making life easier for the occupants and visitors alike.
Client: Deleum Berhad
Category: Oil and Gas Company
Project Date: 2012